Get free quotes

Free calculator, nothing to sign up for

Print farm capacity calculator

Type the number of printers, the hours one plate takes and the parts on it: the tool allows for the hours printers sit idle, plate changes and failed prints, then gives good parts a day, a week and the days for your order.

A tray of identical blue printed parts on a shelf in front of a row of unbranded printers
Parts/dayGood parts off the shelf
Print farm outputruns in your browser
Plates a day, all printers
-
Good parts a day
-
Good parts a week (7 days)
-
Days to finish the order
-
Machine minutes a part
-

Uptime, plate change time and the failure rate start at our defaults (Our defaults: 20 printing hours a day, 80% of printers busy, 10 minutes to clear and restart a plate); change them to your own. Night runs need someone to clear plates in the morning, and packing and checking parts takes time this does not count.

Five hundred branded keyrings for an expo or a thousand enclosures for a start up both come down to one question: how many good parts can the printers make a day? A plate that takes four hours does not give six plates a day, because printers wait for someone to clear them, need a spool change and now and then fail. This calculator counts those losses and gives good parts a day and a week, and how many days your order takes. More on batch production.

The defaults, all ours

  • 20 printing hours a day: four hours go to clearing plates, maintenance and the odd jam.
  • 80% of printers busy: some wait for an operator, a fresh spool or a repair at any time.
  • 10 minutes a changeover: remove the plate, check the parts, start the next one.
  • 7% failed: the same failure share the part weight calculator uses.

No one publishes these for a print farm, so change them to what you see in your own room.

A worked example

Five printers, a 4 hour plate with six parts each. Five printers at 20 hours and 80% busy give 80 printing hours a day. Each plate needs 4 hours and 10 minutes, so about 19 plates, or 115 parts.

Take off 7% for failures and about 107 good parts come off the shelf each day. An order of 1,000 parts then takes about nine and a half working days, before packing and the courier. Run the same order on ten printers and it halves, which is why promotional runs often go to larger farms.

Using the result in a plan

  1. Print one plate and time it, rather than trusting the slicer's estimate.
  2. Count the parts that actually fit on a plate with gaps between them.
  3. Run the calculator and add a day for checking and packing.
  4. For a deadline, ask the shop how many printers it can give your job, not how many it owns.
  5. Approve one sample before the full batch starts.

Frequently asked questions

Why not count 24 hours a day?
Because a plate that finishes at 2 am waits for someone to clear it in the morning. Unless the farm runs night shifts or plate changers, 20 hours is generous.
Is 7% failures realistic?
It is our middle of the road default. A tuned farm on PLA can do better; new materials, tall thin parts and power cuts make it worse. Track your own and type that in.
When is injection moulding cheaper?
Usually at thousands of identical parts, once the cost of the mould is spread thin. For tens to a few hundred, or a design that may change, printing usually wins. A shop can tell you where the line sits for your part.
Can several print farms quote on one big order?
Yes. Give the part, the quantity and the date in the form. We send the request to independent print farms and shops near you, and they reply with their own prices, often with a sample price first. We run no printers ourselves.

More calculators and tools

Free quote request, no obligation

Request batch production quotes

Fill in the job bag the way the person behind a print shop counter would ask: what it is for, the part and its size, the material, how many, the file you have and when you need it. Print shops in your area quote you directly.

Job bagBatch Production
Job
SHOP-1479
Code
MD-11
Date
2026-11-26

01The job

02The print job (optional, it helps the quote)

The part, slicedrule of thumb

-
-
-
-
-
-
Estimate
-

A rule of thumb for the request, not a shop's quote.

03The file and timing

04Your list (optional)

  1. L01
  2. L02
Up to 12 lines: parts, models, sizes, colours.
Needs and options

05Your details

Free and no obligation. By sending you agree that we may share your request with suitable print shops, bureaus, designers and resellers. See our privacy policy.

Get free quotes